GUIDELINE

Part L - The requirement

Part D Materials and Workmanship

Part F Ventilation

Acceptable Construction Details

Acceptable Construction Details Introduction Thermal Bridging and Airtightness

Insulation in Cavity

• Diagram H ACD - 30 Ope split Lintels Ste... • Diagram H ACD - 12 Concrete Intermediate... • Diagram H ACD - 39 Concrete Forward cill... • Diagram H ACD - 38 Concrete backward cil... • Diagram H ACD - 19 Eaves Unventilated At... • Diagram H ACD - 40 Eaves Wall head close... • Diagram H ACD - 29 Flat roof parapet - I... • Diagram H ACD - 9 Insulation below groun... • Diagram H ACD - 33 Prestressed Concrete ... • Diagram H ACD - 22 Eaves Insulation betw... • Diagram H ACD - 15 Timber separating flo... • Diagram H ACD - 17 Masonry Partition Wal... • Diagram H ACD - 18 Stud partition wall -... • Diagram H ACD - 7 Insulation above groun... • Diagram H ACD - 21 Eaves Insulation betw... • Diagram H ACD - 14 Timber Intermediate f... • Diagram H ACD - 27 Gable Insulation betw... • Diagram H ACD - 26 Gable Insulation betw... • Diagram H ACD - 11 Timber suspended grou... • Diagram H ACD - 23 Eaves Insulation betw... • Diagram H ACD - 32 Ope Perforated Steel ... • Diagram H ACD - 20 Eaves Ventilated Atti... • Diagram H ACD - 34 Ope Jamb with closer ... • Diagram H ACD - 29 Flat roof Eaves - Ins... • Diagram H ACD - 8 Insulation above grou... • Diagram H ACD - 13 Concrete Intermediate... • Diagram H ACD - 28 Gable Insulation betw... • Diagram H ACD - 35 Ope Jamb with proprie... • Diagram H ACD - 36 Corner Inverted Corne... • Diagram H ACD - 16 Masonry solid and cav... • Diagram H ACD - 25 Eaves Insulation betw... • Diagram H ACD - 10 Insulation below grou... • Diagram H ACD - 37 Galvanised Top steel ...

Irish Water Requirements for Dwellings

Typical Inspection Reports

No 2. Inspection Foundations Radon Sump Barrier and Blinding No 26 Inspection of Windows on Rainwater System No 11. Inspection of Block work, Brickwork and feature stone band No 2. Inspection Foundations Radon Sump Barrier and Blinding No 12. Inspection of Block work, gable and party walls. No 28. Inspection of timber stairs installation No 3. Inspection Radon Barrier Blinding and Insulation No 22 Inspection Steel Beams and Intumescent paint No 4. Inspection of Radon Barrier and DPC No 25 Inspection of Windows on Front Elevations, DPM and Control Joint No 5. Inspection Radon Barrier Rising Walls Block and Brickwork No 17. Inspection of Stud wall construction No 8. Inspection of Blockwork and elements No 14 Inspection of Structural Beams No 23 Inspection of windows and doors being installed No 21 Inspection of Electrical first fix No 19. Inspection of Roof Construction and breathable membrane No 27 Inspection of Windows on Velux Rooflights No 10. Inspection of Joisting , bridging, Block work, Brickwork and Lintel supports No 16. Inspection of Stud wall construction. No 7. Inspection of Rising walls, Damp proof Course and Blockwork. No 18. Inspection of Roof Construction. No 7. Inspection of Chasing Block work, Brickwork and feature stone band No 6. Inspection Rising Walls Block and Brickwork No 8. Inspection of Radon Barrier and Damp proof Course. No 30 Inspection of timber stairs handrail installation No 15. Inspection of Stud wall and floor joist construction No 29. Inspection of timber stairs and handrail during construction stages No 3. Inspection Radon Barrier Blinding and Insulation No 31. Inspection of Timber stairs handrail. No 32. Inspection of Roof Access Hatch No 24 Inspection of Windows on Front and Rear Elevations No 20. Inspection of chasing in block party walls for electrical first fix No 13. Inspection Brickwork and Firestopping No 9. Inspection of Brick and Block work from 1st to 2nd floor

Part L - The requirement

Share

The requirements regarding conservation of fuel and energy for dwellings are laid out in Part L of the Second Schedule to the Building Regulations 1997 (S.I. No. 497 of 1997) as amended by the Building Regulations (Part L Amendment) Regulations 2011 (S.I. No. 259 of 2011).

The Second Schedule, insofar as it relates to works relating to dwellings, is amended to read as follows: -

L1 A building shall be designed and constructed so as to ensure that the energy performance of the building is such as to limit the amount of energy required for the operation of the building and the amount of carbon dioxide (CO2) emissions associated with this energy use insofar as is reasonably practicable.

L2 For existing dwellings, the requirements of L1 shall be met by: -

(a) limiting heat loss and, where appropriate, maximising heat gain through the fabric of the building;

  1. controlling, as appropriate, the output of the space heating and hot water systems;

  2. limiting the heat loss from pipes, ducts and vessels used for the transport or storage of heated water or air;

  3. providing that all oil and gas fired boilers installed as replacements in existing dwellings shall meet a minimum seasonal efficiency of 90% where practicable.

L3 For new dwellings, the requirements of L1 shall be met by: -

  1. providing that the energy performance of the dwelling is such as to limit the calculated primary energy consumption and related carbon dioxide (CO2) emissions insofar as is reasonably practicable, when both energy consumption and carbon dioxide (CO2) emissions are calculated using the Dwelling Energy Assessment Procedure (DEAP) published by Sustainable Energy Authority of Ireland;

  2. providing that, for new dwellings, a reasonable proportion of the energy consumption to meet the energy performance of a dwelling is provided by renewable energy sources;

  3. limiting heat loss and, where appropriate, availing of heat gain through the fabric of the building;

  4. providing and commissioning energy efficient space and water heating systems with efficient heat sources and effective controls;

  5. providing that all oil and gas fired boilers shall meet a minimum seasonal efficiency of 90%;

  6. providing to the dwelling owner sufficient information about the building, the fixed building services and their maintenance requirements so that the building can be operated in such a manner as to use no more fuel and energy than is reasonable.